Real Estate Developments
Salta Corporate Building
Challenge
Equip a 12-story corporate building with network infrastructure, electronic security, and access control while meeting the standards of a multinational client.
Solution
We installed a fiber-optic backbone between floors, Category 6A structured cabling throughout the offices, IP CCTV with centralized recording, and access control with biometric readers at main entrances and proximity readers in offices.
Results
The building obtained the infrastructure certification required by the client. The network supports more than 500 simultaneous users, and the security system meets the client's global corporate standards.